Harbour Village brings apartments, townhomes, shared outdoor space, and a community building together on South Spring Garden Street. The visual record makes the project’s full scale legible—from earthwork and utilities to framing, enclosure, landscape, and daily life.
Development by Safe Harbour · Construction by JEM Group · Architecture by UpStreet Architects
Construction milestones
A community assembled in clear stages.
Aug 2023Site work
Jan 2024Buildings rise
Feb 25, 2024Community takes shape
Mar 14, 2025Exterior complete
Jul 2, 2025Finished community
August 2023
The ground is opened and the plan becomes visible.
Early earthwork establishes the development’s footprint, road network, and building pads. Wide aerials connect field operations to the larger five-acre site and create the baseline for every chapter that follows.
Purpose
Site-work baseline
Coverage
Footprint + context
Site development · August 2023
Active work fronts face the new access road.Equipment shifts across the future building pads.
The future community footprint, before vertical construction.
January 2024
Vertical construction spreads across the site.
Framing, roof trusses, and sheathing establish the development’s mix of apartment buildings and townhomes. Aerial coverage records both individual building progress and the coordination required across a multi-building site.
Sequence
Framing + dry-in
Reading the site
Buildings + circulation
Buildings rise across the development · January 2024
Enclosure advances building by building.Ground-level view of framing + dry-in.The internal street begins to read as a neighborhood.
February 25, 2024
One development, several building types.
Repeated flights reveal how six residential buildings, the community building, parking, paths, and open space resolve into one coordinated plan. The community’s scale is clearest from above.
Community scale · February 25, 2024
The transformation
The same site, nearly two years apart.
The early earthwork view and the July 2025 flight make the full shift unmistakable—from an active construction field to a connected group of finished homes.
August 2023 · Site workJuly 2, 2025 · Community complete
July 2, 2025 · Finished community
Architecture gives way to everyday place.
The final visit moves between the full development and the details people experience on foot: front porches, stone entries, planted walks, the playground, pavilion, and shared green space. Construction is complete; the community is now the story.
Completed streetscape · July 2, 2025
Townhome architectureShared pavilionCompleted apartment building + entrance
Final project film
Harbour Village, complete.
A concise aerial and ground-level tour of the finished community, presented at full HD web quality.
Community context
A new neighborhood tied into Carlisle.
Wide flights place Harbour Village beside existing roads, services, recreation, and the surrounding landscape. The final aerials document not only what was built, but how the new community belongs to its setting.